|
Wujiang Shengze Dongjigang Tail Water Purification Wetland
Project Location: Shengze Town, Wujiang, Suzhou
Wastewater Type: Tail water from industrial park sewage treatment plant
Treatment Capacity: 24,000 m3/d
Wetland Area: 2.7 ha
Operation Commencement: 2025
Project Effect: SS of tail water reduced by 10% and DO increased by 20%. The tail water is upgraded from "engineered effluent" to "ecological water". It supplies ecological water source to Langzhongdang Lake and creates green development space for Dongjigang River.
|