• 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
 
Projects
> en > case_view.php > home > Projects > Tertiary Treatment of WWTP & Outlet Constructed Wetland
吴江盛泽东计港尾水净化湿地
来源:本站 时间:2026-05-19  点击:54

Wujiang Shengze Dongjigang Tail Water Purification Wetland

Project Location: Shengze Town, Wujiang, Suzhou

Wastewater Type: Tail water from industrial park sewage treatment plant
 
Treatment Capacity: 24,000 m3/d
 
Wetland Area: 2.7 ha
 
Operation Commencement: 2025
 
Project Effect: SS of tail water reduced by 10% and DO increased by 20%. The tail water is upgraded from "engineered effluent" to "ecological water". It supplies ecological water source to Langzhongdang Lake and creates green development space for Dongjigang River.
 
 
返回新闻列表