Location: Haiyu Town, Changshu
Wastewater: Effluent from the wastewater treatment plant of the industrial park
Treatment Capacity: 4000 m3/d
Planning and Design: 2011 -2012
Construction: 2013
Efficiency: Effluent meets the forth level of Environment quality standards for surface water (GB3838-2002). The effluent will be reused as industrial water after treatment in the waterworks.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Recycling;
.jpg)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Eco-tech;
.jpg)
.jpg)
Buffer tank
(1).jpg)
Vertical flow wetland
Pond and Riparian Wetland Surface flow wetlan
.jpg)
Saturated flow wetland
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Low energy;
.jpg)
Solar power station
.jpg)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Scientific Research.
.jpg)
Monitoring Center
.jpg)
|